| AIRPORT
VISUAL AIDS
Runway/Taxiway lighting
Approach Lighting
TVASIS/PAPI Systems
Movement Area Guidance Signs
Airport Lighting Equipment Rooms
Routine Based Maintenance
Apron Lighting
Hold Point
Systems
WIG WAG lights
Some Past Projects include: Sydney Airport 1997/1998 Asphalt Resheet Programme, Airfield Lighting.
The demolition of existing airfield lighting systems within the resheet area, maintaining the existing airport ground lighting system to satisfy ICAO Regulations. The reinstatement of over 1,000 inset lights and 144 elevated lights.
Installation of Movement Area Guidance Signs, Stage One, Sydney Airport.
The wire and installation of 124 Movement Area Guidance Signs throughout Sydney Airport runways and taxiways. Works included bulk excavation of each site, 12 kilometres of trenching, 15 kilometres of cable installed underground. All works were performed in accordance with Sydney Airport safety requirements on twenty four hour shifts.
Precision Approach PAPI Indicator (PAPI). The installation of temporary PAPI services to suit shortened runway conditions at Sydney Airport.
Included the installation of temporary runway end / threshold lighting and switching unit to shorter centreline and runway edge lights.
TLER Feeder Cable The replacement of runway, taxiway and approach light system cables and the installation of new ducts and pits to joint to the existing system.
Taxiway Lima, Bankstown Airport The installation of primary and secondary cabling from the Airport Lighting Room and the installation of inset lighting into the pavement.
|
|
AIRFIELD
LIGHTING MAINTENANCE
These ongoing works include: Installation of temporary runway ends for asphalt resheet
works, The relocation of PAPI system to suit temporary runway ends, The installation of runway lighting switching unit to suit the shortened
runway, The installation of LAHSO lighting;
repair works to Movement Area Guidance Signs, Maintenance of Runway 07-25 approach light
system, The reinstatement of ground lighting to suit asphalt pavement
works, The removal of redundant cabling on Runway 07-25 for salvage
works, The relocation of runway edge lighting to suit the extended blast
shoulders, The relocation of primary and secondary cabling to suit project
works, and the installation of optic fibre to the Airport Lighting Equipment Room.
Eastern Airport Lighting Equipment Room, Runway 25, Sydney Airport
Turnkey design, construction and installation works, including: High voltage cabling and substation
installation, AMS control system installation, Building installation, including sewerage, light, power, water and airconditioning,
Fire Systems, CCR installation, Lightning protection, Telecommunications and optic fibre
networking, Generating Plant.
|